Flood Control

From power facilities to bridges... from pump stations to flood control... 3D has built a strong reputation for delivering quality work that spans from project planning to construction phases.

When devastating floods occur, 3D is on the job, serving the Corps of Engineers (COE) by providing flood control wall construction along with pumping systems. These pumping systems — capable of pumping flows greater than 100 million gallons per day — funnel out captured surface waters from behind concrete flood walls and levees during flood events.

Featured Project

  • Untitled-50
  • Untitled-53
  • Untitled-55
  • Untitled-58
  • Untitled-61
  • Untitled-63

Project Portfolio